Data Centers
HIL Testing Solutions
Real-time HIL testing for UPS, BESS, generators, and critical power infrastructure – from component validation to full system commissioning.
Data Center Power Systems Solutions
Data center infrastructure is becoming more complex as AI and High-Performance Computing (HPC) workloads drive unprecedented power demand and zero tolerance for downtime. Power architectures now combine Uninterrupted Power Supply (UPS) systems, battery storage, generators, cooling systems, and grid-interactive technologies that must work together seamlessly.
Typhoon HIL enables system-level validation of data center power infrastructure by connecting real controllers and protection devices to a real-time digital twin of the full system. Engineers can test control behavior, protection schemes, and system interactions before commissioning.
Key system validation areas:
- Grid connection and backup power transitions
- UPS performance under dynamic load conditions
- Battery energy storage dispatch and cycling
- Generator synchronization and recovery events
- Protection coordination and fault response
- Load variability from AI and HPC workloads
By testing the complete energy chain in a real-time digital twin, engineers can identify integration issues early and reduce commissioning risk, enabling component manufacturers, system integrators, and data center operators to validate controls, protections, and system performance before deployment.
C-HIL Across the Data Center Power Lifecycle
| For Component Manufacturers | For System Integrators | For Data Center Owners and Operators |
|---|---|---|
| Simulation and testing for UPS manufacturers | Virtual system integration | Reduce commissioning risk |
| Solid State Transformer (SST) validation | Protection and control validation | Validate upgrades before deployment |
| BESS development and verification | Factory acceptance testing | Improve reliability and resiliency |
| Digital and virtual protection OEMs | Multi-vendor interoperability testing | Support microgrid and grid-interactive operations |
| Controller and power electronics validation | Digital twin for power and cooling systems | Minimize downtime during expansion projects |
Why data center teams choose Typhoon HIL
Validate systems virtually before on-site installation.
Catch multi-vendor issues before they reach the field.
Fix design issues in simulation, not in the field.
Zero tolerance for downtime – test everything before it matters.